Quantcast
Channel: SCN : All Content - SAP Extended Warehouse Management (SAP EWM)
Viewing all 1703 articles
Browse latest View live

Featured Content for SAP Extended Warehouse Management (SAP EWM)

$
0
0

SAP-Infotag Lager- und Transport management

November 25, 2014

SAP Germany will have their traditional yearly logistics conference with many customer case studies on TM and EWM on November 22nd in Mannheim, Rosengarten Conference Center. Find further information here as well as in the detailedagenda.

Contact: Guido Kaup



Influence SAP EWM

Author: Matthias Keller

On Oct 22nd, 2014 The collect phase of the first customer connection project for SAP Extended Warehouse Management (EWM) has been kicked off. Read more how customer can suggest small enhancements to the product. Oct 27th, 2014

 

SAP HANA Based Operational Reporting Released for SAP EWM

Author: Matthias Keller

On May 19th, 2014 SAP released SAP HANA based operational reporting for SAP Extended Warehouse Management (EWM). May 20th, 2014

 

SAP EWM 9.1 is general (unrestricted) available

Author: Matthias Keller

On May 5th, 2014 the RampUp phase for SAP EWM 9.1 ended  some weeks earlier as originally planned due to extraordinary customer feedback and high quality. SAP EWM 9.1 is now general available.May 05th, 2014

 

New Cookbook on Pick-by-Voice with EWM

Author: Matthias Keller

This cookbook describes how to build a voice enabled transaction in EWM. It explains which parts in EWM and ITS are used to create the voice enabled transaction.Jan. 23rd, 2014

 

Getting Started with SAP EWM 9.1

Author: Matthias Keller

This article shall guide you to the most important information to get started with SAP EWM 9.1. Furthermore it points out which new solution manager content and how-to guides are delivered with SAP EWM 9.1.Dec. 6th, 2013

 

Foundation of German speaking SAP EWM user group within DSAG

Author: Matthias Keller

On Nov. 12th the first dedicated SAP EWM user group meeting took place. During the event the German speaking EWM DSAG user group AG Lagerlogistik/EWM has been officially founded. In a very open minded atmosphere 50 participants from SAP EWM customers, partners and representatives of SAP development and consulting exchanged information, experiences and feedback from their SAP EWM implementation projects and productive installations. Nov. 15th, 2013


SAP EWM 9.2 Documentation

$
0
0

We would like to inform you that the product standard documentation for SAP Extended Warehouse Management 9.2 has been successfully completed and delivered at release-to-customer date as planned. See http://help.sap.com/ewm92.


You can access all following information related to SAP EWM 9.2 in the Online Help Portal:

  • Release notes
  • SAP Library (Online Help) including new SOA documentation
  • Standard guides: Master Guide, Upgrade Master Guide, Application
    Operations Guide, Security Guide, and Administrator Guide
  • BI Content & BI Content Extensions

        New Help Portal feature offering: Feedback buttonIn addition to our standard delivery, we include

  • SAP Solution Manager content

        Pending, you shall get an early preview of EWM example business scenarios and processes as PDF documentation on the SAP Service Marketplace


 

Documentation TypeWhere to find it
Release Notes

 

SAP Service Marketplace under https://service.sap.com/releasenotes-> SAP Solutions -> SAP Extended Warehouse Management (SAP EWM)

SAP Library (Online Help)

SAP Library under http://help.sap.com/ewm-> SAP EWM 9.2

Master Guide, Upgrade Master Guide, Application Operations Guide and Administrator's Guide

SAP Service Marketplace under http://service.sap.com/instguides  -> SAP Business Suite Applications -> SAP EWM -> Using SAP EWM 9.2

Security Guide

SAP Service Marketplace under http://service.sap.com/securityguide->
SAP Business Suite Applications -> SAP SCM -> SAP EWM

Solution Manager Content Documentation (scenario descriptions, scenario configuration guides, integration guides, process descriptions, test cases)

You can find Solution Manager Content for SAP EWM here
BI Content

SAP Library under http://help.sap.com-> SAP NetWeaver -> BI Content (All Releases)  ->  SAP NetWeaver 7.4 BI Content 7.47 SP 06 -> Application Help -> BI Content -> Extended Warehouse Management

Getting Started with EWM 9.2

$
0
0

Goal

Guide where to find relevant EWM 9.2 information

EWM 9.2 Documentation

Summary of the most important official SAP EWM 9.2 documentation e.g. Application Help, Master & Upgrade, Security, Application Operations Guide, …  you find here: http://scn.sap.com/docs/DOC-59616

Important SAP Notes for Getting Started with EWM 9.2

InstallationSAP note 2064494

Installation and Upgrade Information

Tip:

SAP Note 1606493 - SAP EWM Deployment Options – Best Practices

SAP Note 2064494 - Installing or upgrading SCMEWM 9210

Technical Information on EWM 9.2

Detailed information on availability dates, maintenance end dates and upgrade paths, as well as technical release information (supported databases, operating systems, browsers, etc.) for EWM 9.2 you find in the Product Availability Matrix.

Guidelines and recommendations on hardware requirements and  software considerations for your implementation you find here: http://service.sap.com/quicksizer

New Solution Manager Content in EWM 9.2

New How-To Guides

How to Use PPF(Post Processing Framework)  in EWM (http://scn.sap.com/docs/DOC-39927)

How to Add Application Content to the Warehouse Management Monitor (http://scn.sap.com/docs/DOC-35822)

Please navigate hereto the SAP Service Marketplace to find all published How-To-Guides for SAP EWM

EWM 9.2 RampUp Knowledge Transfer

Please find herethe SAP EWM 9.1 Online Learning Map

Inorder to access RKT an email needs to be send to rkt@sap.com (EWM 9.2 RampUp Customers only)

Further information

Installation Issues

In case of issues with update to Netweaver 7.40 please open a ticket to component BC-UPG-TLS-TLA

In case of issues with Solution Manager / MOPZ please open a ticket to component SV-SMG-MAI

In case of issues with Add-on Transport please open a ticket to component BC-UPG-ADDON

Support Package Schedule

You find the support package schedule for SAP EWM 9.2 on the SAP Service Marketplace here.

Connection error Destination: RFCGEOCODER_TEST_PTV

$
0
0

Dear All

 

  After the successful configuration for EWM - CIF, i created the distribution model CFC1 and executed the distribution model. But when i executes i received the error message

" Internal error in RFCG, IN. RFC: Connection error Destination: RFCGEOCODER_TEST_PTV Message no. GEOCODING004"

 

I checked the RFC connection for GEOCODER it works fine.

 

Kindly help on this issue.

During the GR in EWM ONLY the first HU is transferred from EWM to ERP but not the rest

$
0
0

Hi Experts,

 

I do not why HUs are not transferred from EWM to ERP.

 

The business process is the following:

1) Creation of PO in ERP (ME21N)

2) /SCWM/ERP_EGR_DELETE - Generate or Delete EGR from EWM 

3) /SCWM/GRPE - GR Preparation - External Procurement

4) /SCWM/RFUI - Receiving of HU by ASN

 

When I Receive the first HU, the first one it is transferred to the ERP along with the GR

(delivery flow document in the ERP)

first HU.JPG

 

When I Receive the following HUs, only the GR it is transferred to the ERP but not the HU

(delivery flow document in the ERP)

following HUs.JPG

 

I've been check the configuration described on the following post but with no result:

Donot transfer Packing from EWM to ERP during receiving in EWM

 

I've also been checking the configuration under the customizing of ERP Integration but also with no result.

 

Has someone been on the same situation? Thanks

Return to vendor EWM scenario

$
0
0

Hi,    

 

I'm trying to post a return to vendor from EWM. I have done the putaway and the HU is in the bin but when I try to return it to vendor through the follow-on option of the inbound delivery in EWM the system gives me the following error:

 

Inward del. completed indic. for item 000010 already set, change not possible.

Because of previous error, dispatching is not possible for ID 0041000346

 

Is it the correct process?

 

Thanks in advance.

 

Regards,

Delete Packinging Specifications in mass

$
0
0

Hello All,

 

Currently we have to delete around 50,000 Packing Specifications. Is there anyone who has encountered such situation earlier ?

 

Any Suggestions which can help us delete the same in Quick time without impacting system performance ?

 

 

Thanks

Assign TU to Packaging material - EWM

$
0
0

Hi,

 

Error while linking the packaging material (TU) and means of transport in the Easy access menu .

 

Issue.png

Please share your ideas.

 

Thanks

Jerry.


Keeping Pace with the Evolution of Logistics and Fulfillment - Article

How to trigger pack spec for repacking during auto replenishment

$
0
0

Hi All

 

My EWM Scenario is : When replenishment is occurring from high rack to the pick face area, the replenishment quantity has to be repacked within the repack work center (where downsizing is done ) into smaller bins. The product is stored in pallets in the high rack area , where as it is maintained in totes in the pick face area .

 


Need help to know how i can achieve this.

Server sizing for EWM

$
0
0

Hello Experts,

We are working on server sizing estimation for the EWM project for one of our customer.

What are the information (different master data and transactional data volume) we should collect from customer so as to arrive at the SAPS (SAP Application Performance Standard).

Any suggestion will be highly appreciated.

With Regards,

Malay

Assign Warehouse nr to MM st. loc with stock

$
0
0

Hello gurus,

i have to assign a new warehouse number to a storage location that has already stock on it.

How i can migrate the stock from MM to WM bin?

Thanks in advance.

Bye.

M.

Return STO via Direct Outbound Delivery

$
0
0

Hi All,

 

I've read lots of old posts regarding the returns STO process......but haven't yet found anything that solves my issue.

 

In a nutshell, the process I'm trying to build is this:

 

  • Return back to factory is initiated in EWM
  • Direct outbound del is created in EWM
  • In ERP, returns STO and corresponding returns delivery is created
  • In ERP MIGO is performed to post the goods into in-transit from EWM plant
  • In ERP post goods receipt is performed against the returns delivery
  • Goods now posted from EWM plant to receiving (originating) plant.

 

 

 

So far the solution works as far as the returns STO and returns delivery are created automatically in ERP.

And here is where we get the error - when trying to perform MIGO we get the message: "Posting with reference to pur. order only possible for integrated whse"       I've tried to reference the delivery but I can't get it to work.

So the question is:    Can this returns STO process work with an EWM managed sloc?  Is there a work around process?

 

SAP seem to suggest that if you are returning from a warehouse managed sloc then you should use a normal STO process (ie do not use the returns indicator)...........but the issue this causes us (and the reason for trying to set up above process) is that we often process obsolete materials.....and as standard, procurement is not allowed for such material statuses.

 

If anyone has any hints / tips they would be greatly appreciated.

 

Regards

Guy

Split Valuation in EWM

$
0
0

Hi All

 

In SAP Help it was given like

 

batches in EWM are used to handle valuation types of split-valuated products that are not batch-managed in ERP. To use such products in EWM, you must first execute the transaction Determine and Set Prices in ERP or run the corresponding report /SCWM/R_VALUATION_SET. The report downloads the valuation types from the ERP system, which are then handled as batches in EWM.


Batch - Batch Management - SAP Library


But when I run this report it is just creating entry in table /scwm/t_set_val not creating batches.


Can someone help if I have to maintain any other configs?


Thanks

Sasidhar Gupta


Trigger Email through PPF

$
0
0

Hi everyone,

     The requirement is once picking of high value (price) items is done ,an email should be sent to supervisor. its not authorization email just we are sending an information to the superior that item is picked from the bin. how this can be done in PPF. I am new to PPF guide me.


PI Document with deletion indicator still locks products

$
0
0

Dear experts,

 

I have created an physical inventory document with procedure AS (annual physical inventory product specific). Then I deleted it with /SCWM/PI_PROCESS.

Deletion indicator is set on all position.

Now I can´t work with this stock because system tells me products are locked.

Also I can see in the warehousemonitor at physical inventory progress that I have many open objects allthough I have deleted every PI document.

Is there a report to delete the PI documents with deletion indicator or do I something wrong with the deletions?

 

Thanks for your help.

 

Kind regards

Dieter Irmler

Sources of information

$
0
0

Hello,

 

I write my master thesis about EWM and the advantages compared to WM.

My aim is to develop an excel tool to support the decision of the customer if a switch to EWM is economically reasonable.

 

Are there any sources of information except the most recent SAP Press Book about EWM and the SAP-Help?

 

 

I am thankful for any help

 

 

 

Best regards,

 

Johannes

Picking an HU with different products

$
0
0

Dear Experts,

 

we have pre-packed HUs for sets, which HUs are containing more products. When the delivery comes in, we want to ship the products in the HU they are already in.

 

Do you have any idea how to do that kind of picking?

 

Thanks,

Tamás Becker

Quality lot integration with SAP EWM.Inspection Lot not getting created fro inpection type 17

$
0
0

Hi All,

 

I am trying to integrate SAP EWM with QM. I have activated inspection type 17 in material master but lot number is not getting generated in ECC.

 

When I check Material document in ECC it is showing GR status doc as "8" but lot number not getting generated in QA32.

 

 

 

 

Regards,

Venky

SAP-EWM Issue for return to vendor

$
0
0

HI,

 

I have a issue while return to vendor process, as i have set up inspection rule for the material and the following POSC set-up is working fine and going to work center but while doing the quality inspection for the material in the follow up list unable to see other than Putway and scrapped where return is missing, in the drop down

Viewing all 1703 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>