Hi All
I need help to configure below scenario in EWM. Warehouse receives the inbound HUs which can contains single material or multiple materials. For the normal HU, putaway should happen after unloading and for mixed HUs, putaway should happen after sorting. For this, I have configured de-consolidation and POSC. But somehow, it is not working. All kinds of HUs are coming to de-consolidation workcenter after unload. This is my issue one.
The other challenge here is the mixed HU will be de-consolidated based on material and moved to interim storage area before final putaway. Again here, they re-pack based on capacity of resource and then do putaway. This I have achieved partly by calling LOSC before putaway task in POSC. So, now I will get tasks to move HUs from de-consolidation area to interim storage area and then to final bin. But I am not able to do re-pack at interim storage area.
I have tried to put packing task before putaway task in POSC, and configured interim storage area as work center - LOSC is not triggered.
Any thoughts to solve these issues?
Thanks
Sasidhar Gupta