Hi,
I have done the GR in EWM system, but the same is not replicating in the ERP, when I have checked in the log it is showing the error message "RFC for GTS could not be determined.
But my question is. is GTS integrtation is required in EWM?
Also provide the solution for the same.
Regards,
venu