Hi guys, I need a little help here.
Every time the quality department post the usage decision through QA32, the system performs the 321 movement type transferring the material from quality to unrestricted use. Although the material is transferred from quality to unrestricted use at the same time, the system creates a delivery (posting change) that remains open in EWM.
My doubt is: why we need the posting change in EWM if the status change (321 movement type) was already done in ECC and also in EWM. Or why the system perform the movement if the delivery (posting change) in EWM is still open?
Which is the right way to work?
1. After the posting of QA32, the system should create a posting change in EWM and wait until the processing is completed, then transfer the result to ECC;
2. The system performs the movement type 321, changes both systems and does not create the delivery (posting change) in EWM.
And why I have a mix of both processes?
Thank you in advance.
Anderson Ranéa