Hi,
We want to use the transportation management only in EWM (i.e. do everything in EWM and not send anything to either ECC or TM).
This is the process that I want to follow:
1) Create Sales order in ECC
2) Create delivery in ECC and distribute to EWM.
3) ODR in EWM is created.
4) ODO in EWM is created and route determined in ODO.
5) From the ODO, I want to create a Planned Shipment document (of type PTRQ).
6) Pick, Pack and Stage as per POSC.
7) Manually create a Freight Document to load build and include multiple Planned Shipment Docs in it.
8) Step 7 should create a TU/Vehicle via some PPF. I don't want to use Check In/Out so just want to manually load in the TU and do PGI
9) Final Shipment document (of type FTRQ) and Bill of Lading document (Of type BOLD) to be generated.
Question 1 - Is this the right sequence flow for the activities?
Question 2 - In Step 5 above, I system is not generating the planned shipment document automatically. Can you please guide me with how to set up the PPF (which action and what are the prerequisites to be met) so that it can create a Planned shipment document.
Thanks
James