Hi Everyone,
I need your help in finding the final configuration part from SAP EWM side. Not able to find the solution anywhere.
We are trying to implementing the following solution:
GE MES Proficy(Historian) --> SAP Plant Conectivity 2.3 ---> SAP EWM
As per the steps mentioned in below mentioned link. I have done all the configuration and able to make the following connection:
- Source System - GE MES Proficy Historian (Connection Successful)
- Destination System– RFC Destination for SAP EWM (Connection Successful)
- Define Agent– with Port Type SAP EWM RFC Server
- Define Notification
- Start the Agent successfully
- Created the RFC Destination in SAP EWM via SM59
- Test RFC Destination Connection– Successful
After the RFC Destination connection is successful, What configuration need to do in SAP EWM to handle/process the notification from SAP PCo 2.3.
Thanks,
Ritim