Hi all,
I have a Storage Location (1234) with only one Storage type (FIX) and one Storage Bin (FLOOR).
What I want is all materials should go (when receiving) to this Storage Bin.
I have configured the Putaway strategy for the Storage Type "F - Fixed bins"
But it's not working. The system is always considers the Next empty bin strategy.
I don't want to make the storage bin fixed per Movement type or per material...The same material can be maintained in different storage locations.
Thank you
Best regards,
Kifah Yacoub