All,
I have a problem in a PRD system.
An inspection type 17 was used for incoming inspection. The Inspection Plan uses a fixed sample size of 1. The inspection lot was created in ECC. The results recording and Usage Decision was done in ECC. The corresponding inspection document was updated with the UD code ACC with follow up action putaway. The stock is stuck in status 1Q despite the fact that the usage decision was done. This is happening for one out of the 10 HU's on the inbound delivery.
Question:
1. How do i move the stock from 1Q to 1F? The transaction code /SCWM/POST will not allow me to do this giving an error message that the stock is stuck in quality inspection
2. Has anyone seen this behavior in EWM-QIE?
I have also raised an OSS note with SAP. This incident has gone to the development team in Germany.
Thank you for your inputs if any in advance
Regards
Anup