Quantcast
Channel: SCN : All Content - SAP Extended Warehouse Management (SAP EWM)
Viewing all articles
Browse latest Browse all 1703

Repacking Task - Packaging Specification

$
0
0

Hi ,

 

I am trying to replicate a scenario .

 

We are receiving a complete HU from High rack and moved to work center for repacking .

 

After the repacking the remaining product move to the High rack and the rest to the destination bin ( Floor Rack )  .

 

For example : Due to replenishment the task is generated to move the Product to floor but the complete Hu is not moved .

 

Rather , they are moved to work center and broken down according the packaging specification , In the example , the replenishment is for 2 pc and the available quantity in the high rack is moved to Work center , now here I take 2 pc and move the rest back to storage type (high Rack ) .

 

I am able to replicate the same in  the system with LOSC ad POSC , but breaking the HU automatically by the system is an issue .

 

The HU is not getting broken into the two HU , one is the HU we received from the source and other task that should break the HU into 2 pc and for he same the system should deconsolidate . It should leave with 98 in one HU and other with 2 pc in a special bin .

 

Attached the screen shot of the packaging specification  and the how it is reflecting the Work center.

 

Please Suggest .


Viewing all articles
Browse latest Browse all 1703

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>