Hi,
after creating batches by using MSC1 in LSMW and creating a batch input map. the batches are in the ERP-System but not in the SCM System.
By creating Batches with MSC1N manually, the Batch is ciffed to the SCM-System.
I have an active Integration model for material master witch Batch, running every hour.
The setting for Material Master Change Transfer in the CFC9 is set to "2"
Is there anyone with experience in creating batch-master data for Migration?
Thanks for all info
Bernd