Inbound processing with POSC: Issues with WTs.

$
0
0

Dear EWM Experts,

 

I have configuered POSC for Inbound Delivery Processing.

 

POSC has 3 steps:    Unload, Count, Putaway (IB01 / CNT / IB03).

 

To start with, I have distributed Inbound Delivery from ERP to EWM without HU.  I created a HU by using Packing Functionality for Inbound Delivery.

 

The next step I did is to go to "Unload" Screen and created "Unloading WTs (Complex)" by selecting a HU.  A WT was created.  I confirmed this WT.

 

But the unloading WT has Soucre Storage Type=  9030, Source Bin = UNLOAD_01.  Destination Storage Bin has also been determined from 0020 Storage type.  Once I confirmed the unloading WT ,  the Goods Receipt, Putaway and Unloading - All 3 - status in Inbound Delivery was changed to "Completed".

 

I am surprised by this behaviour as the POSC had 3 steps and just by executing Unloading and Confirming the WT, all activities were completed for Inbound Delivery.

 

Wehether the system should have created 3 WTs, 1 per each activity? why unloading WT has destination storage bin from 0020 storage type? Is there some thing wrong with my configuration?

 

Tried to provide with maximum information.  Please guide me through to execute a simple Inbound flow with POSC.

 

Many Thanks,

Shetty