Hello,
I have configured inbound process with quality inspection. I didnt use POSC but instead LOSC. I configured step QIS with warehosue process type 3060 for the warehouse. Everything is already set up and I am able to perform usage decision. However after usage decision, putaway task is not created. The handling unit does not go from inbound section to outbound section of the workcenter.
I'm wondering if this has something to do with missing configuration. I hope someone can help me point out possible ares for investigation.