Hi All,

 

I am trying to do Deconsolidation using POSC and somehow it is not working starting from IB01. Here is what I have done.

 

1. Set up POSC as per below snapshots.

2. Set up different PACI for 2 Products which have different Activity Areas.

3. Different Consolidation Groups for each Activity Area.

4. Created Work Center and assigned Storage Bin to the Work Center.

5. Created PO with 2 materials and later created inbound delivery and packed 2 items into 1 HU.

6. IBD was distributed to EWM and when I try to create WT for step1, system is throwing error which is shown.

 

I have attached all the config steps that I have done. Request you to check and correct me if I am missing something.

 